Projects
- Home
- Projects
Drax Power Station
The project comprised the installation of redesigned ventilation system to the Gas Pressure Reducing Station to bring the site in line with current standards and compliant with British and European legislation.
HYDEPLOY 2 Compound Build
HyDeploy is a demonstration project funded by OFGEM, Cadent Gas and Northern Gas Networks to establish the feasibility of supplementing Natural Gas supplies with hydrogen to reduce the carbon dioxide (CO2) emissions. To achieve this reduction, a consortium formed of …
H21 COMMISSIONING
The Project Northern Gas Networks are leading the H21 project on behalf of the other Gas Distribution Networks within the UK to provide the safety based evidence for a 100% Hydrogen conversion in the below 7 bar GB gas distribution …
TR Unit Replacement
The Project The switch mode power supply corrosion control systems installed at various remote site locations across the Northern Gas Network region have experienced operational issues since implementation with a more robust solution required for pipeline corrosion protection purposes. The …
West Winch Regulator Skid
The Project As part of the Cadent Gas Pre-Heat Replacement project – Phase One at West Winch AGI, a new packaged Boiler House and electrical Pre-heat was to be installed on site including the installation of a new HP-MP Pressure …
Brenda Road
The Project As a result of the Asset Health Survey Programme carried out by Northern Gas Networks under the RIIO price control period, it was identified that the existing plant and equipment at Brenda Road site was obsolete, approaching end …
WRENTHORPE
As a result of the Asset Health Survey Programme carried out by Northern Gas Networks under the RIIO price control period, it was identified that the existing plant and equipment at Wrenthorpe PRS site was obsolete, approaching end of service life and in need of replacement.
POOLE ROUNDABOUT
As a result of the Asset Health Survey Programme carried out by Northern Gas Networks under the RIIO price control period, it was identified that the existing plant and equipment at Poole Roundabout PRS site was obsolete, approaching end of service life and in need of replacement.
MARTON CROSSROADS
As a result of the Asset Health Survey Programme carried out by Northern Gas Networks under the RIIO price control period, it was identified that the existing plant and equipment at Marton Crossroads PRS site was obsolete, approaching end of service life and in need of replacement.
BRAYTON
As a result of the Asset Health Survey Programme carried out by Northern Gas Networks under the RIIO price control period, it was identified that the existing plant and equipment at Brayton PRS site was obsolete, approaching end of service life and in need of replacement.